The application decides the configuration more than the site size does. A factory is sized on motor starting current and demand peaks; a hotel is sized on the evening peak after sunset; cold storage is sized on continuous cooling load and outage tolerance. Each page below explains how the load shape changes the PV, converter and battery sizing.

A 100 kW load is not a 100 kW load. The shape of the demand curve over 24 hours decides how much battery you need, and how much PV can actually be used on site.

What every configuration starts with

InputWhy it changes the design
Load scheduleContinuous kW, peak kW and which circuits must stay live. Without this, sizing is guesswork.
Daily energy profileDecides how much PV can be self-consumed instead of exported at a low tariff.
Starting currentMotors and compressors can draw several times rated current. It sizes the converter, not the battery.
Grid status and export rulesDecides whether the system is grid-tied, export-limited, or grid-forming.
Outage toleranceDecides backup duration, which is the single largest driver of battery capacity.

What we do not do: we do not size a system from a monthly electricity bill alone. A bill tells you total consumption; it does not tell you the peak, the starting current, or which loads you can live without. If a supplier quotes from the bill alone, they are guessing and calling it engineering.